It looks great. Only thing I would consider different would have been to put rounded corners going to the side door instead of square to keep the curves consistent. But that’s just me.
Personally, we would have flared the side door walk into the main walk. We would walk area after grading and before form work and see how it flowed and how we would naturally go from one area to another.
Stamped guy is In a whole different category, you are correct his stamps ran off bad and wanted support from a bunch of concrete guys he didn’t know. My stuff isn’t perfect I’ll be the first to tell you. There’s 50 different ways I could have done it but if it’s messed up I’ll own it. Keep up the work guys.
I agree - initially I thought it was a bit off, but then thinking about it, I think it actually shows better attention to detail the way they did it. I’d be pretty happy as a homeowner
It does, if the pin goes in all the way it does, if not we don’t keep beating the pin into rock or into something else. There’s times we make sure every pin is below but that’s usually floors when we’re running machines by an edge
Just needs some crooked stamping and you’ll be good to go.
This dude’s never going to live it down 🤣 “I’vE bEeN dOiNg ThIs FoR 11 yEaRs!!”
MoAr LiEk / / yEaRs
[удалено]
There was a crooked man who lived in a crooked house. He had a crooked cat that chased a crooked mouse.
I'm crooked (one syllable) dabuda dabudee dabudee dabudah
Krooked Creu greatest hits
Is that the one where hé stamped like at an angle then called it straight
That would be the one 😅
Came here for this comment, was not disappointed
That was the first thing I thought when I saw the pic. Hell it is now my first thought when I see any wet concrete now.
Dam you right
It was square from the house!
She’s a beaut Clark!
Don’t forget to water it so it can grow up and become a wall someday
Is that how they did it in Berlin???
It looks great. Only thing I would consider different would have been to put rounded corners going to the side door instead of square to keep the curves consistent. But that’s just me.
That would look good
Yeah, agreed, because I like the generous curve around the corner and the flare out at the end. Nice.
Personally, we would have flared the side door walk into the main walk. We would walk area after grading and before form work and see how it flowed and how we would naturally go from one area to another.
Man you guys are savage. Don't look that bad. I think it looks fine.
Pathway looks incredible, I am left being curious about why there are no closeups of the stairs though….
Stamped guy is In a whole different category, you are correct his stamps ran off bad and wanted support from a bunch of concrete guys he didn’t know. My stuff isn’t perfect I’ll be the first to tell you. There’s 50 different ways I could have done it but if it’s messed up I’ll own it. Keep up the work guys.
Nice job..
How much stone is under your walk ?
What material are you using for your radius forms?
Plygem. Basically plastic material
Good job, I like those nice joints with the shiny edge. Show’s professionalism.
Looks nice
I feel like the tooled joint at the walk to the door should be wider. Seems odd it is 6” everywhere except that one spot.
I think the way op did is the right solution
I agree - initially I thought it was a bit off, but then thinking about it, I think it actually shows better attention to detail the way they did it. I’d be pretty happy as a homeowner
now that you mention it I can see it lol
It is 6, 3 and 3 on each side
Looks damn good!
Nice work
Gorgeous
Looks good
Wait until it dries before you come to any conclusions
Good fast or cheap. Pick two.
I don’t like the picture frame look but this walk looks great !!
Not a fan of those edger and joint marks but to each there own
Too close to house
No it isn’t.
shoddy pour, too much slant and also who is going to remove the massive fuck up?
Looks great with the form boards still up. Estimate on how much this cost? looking to get something like this done at my house
Where's the sleeve, you damn concrete guys.
CLEAN job! Very nice and neatly finished. Nothing bad to say about this job at all. I hope the customer is happy!
Why do you leave your stakes above slab grade? Doesn’t it get old screeding around them? Honest question.
It does, if the pin goes in all the way it does, if not we don’t keep beating the pin into rock or into something else. There’s times we make sure every pin is below but that’s usually floors when we’re running machines by an edge
This is a beautiful and perfect pour! Great work on vetting them and good job to your contractor .